DS Twin-shaft Shredder (double-rotor)
Low-speed twin-shaft shredder for bulky plastics, tyres, pallets and mixed waste, using Siemens PLC control and 8-15 rpm high-torque cutti...
View modelOpen a model for full specifications. If you are not sure which one your material points to, the questions further down narrow it faster than the spec tables do.
Low-speed twin-shaft shredder for bulky plastics, tyres, pallets and mixed waste, using Siemens PLC control and 8-15 rpm high-torque cutti...
View model
Long-pipe shredder for PE pipes up to ⌀630 or ⌀1100, designed to reduce long profiles before downstream crushing or washing.
View model
Horizontal-pusher single-shaft shredder for plastic lumps, containers, pallets and packed waste where controlled rotor feeding is required...
View model
Swing-arm single-shaft shredder for PE film, bags and soft plastic waste, with Siemens PLC control and 500-2000 kg/h model range.
View modelMixed bulky waste is unpredictable by nature. What sizes the machine is the worst item that can reach the rotor, which is why torque reserve and knife protection come before throughput.
Four things decide the answer here. Work through them in order and the model list gets short before anyone opens a spec table.
When the material is not only plastic, the conversation shifts to knife protection and torque reserve.
The aim is to open material without turning the whole stream into fines.
Industrial shredders rarely finish the job. They prepare material for a second station.
If the feed is plastic scrap in a known form, a plastic shredder is usually cheaper and better matched.
A machine is only worth buying when its output matches what the next station needs. These are the four boundaries we check before quoting anything here.
Bulky mixed waste: drums, tyres, timber, cable, big lumps and material that is not only plastic.
Opening the material safely, with enough torque reserve to survive whatever is hidden in the feed.
Opened material ready for a second size-reduction or sorting stage. This is rarely the last machine.
Whether the discharge is consistent enough for the station after it, and whether the machine survives contaminants.
Most of what we build goes into plastic recycling lines, but the shredding platform itself is not plastic-specific. A twin-shaft rotor turning at 8 to 15 rpm does not care much whether it is shearing an HDPE drum, a wooden pallet or a bale of textile offcuts. What changes between those jobs is the knife steel, the screen aperture and how fast the wear parts go.
This page exists because buyers searching for an industrial shredder often are not running a recycling plant at all. They have a volume problem, a confidentiality problem or a disposal cost problem, and shredding is the answer. If you do run a plastics operation, the plastic shredder machine page covers model selection by plastic waste form in more detail.
Be aware of one boundary before you read on. We build the shredding machine, not complete recycling lines for materials other than plastic. If you need a wood pellet plant, a metal recovery line or a hazardous waste facility, the shredder is one component and you will need other suppliers for the rest. We would rather say that up front.
Four different reasons people buy one of these machines. The reason matters, because it changes what a good result looks like and therefore what you should specify.
Telling us which of these four you are doing changes our recommendation more than telling us the material does. A volume-reduction job and a recycling job on the same waste can call for different machines.
The platform is the same; the wear parts and the expectations are not. This table is written from what actually changes on the machine rather than from a list of industries.
We do not publish knife life figures by material, because they depend on contamination we cannot see from here. What we do is quote the steel grade for your material and supply the wear part list so you can budget against your own stream.
Industrial shredder is a broad search term, and a good part of the traffic that reaches this page is looking for something outside what we build. Rather than have that surface after three emails, here it is now.
If your project needs any of the above, tell us anyway. Specifying the interface properly so a shredder fits equipment bought elsewhere is straightforward, and it is better than discovering a mismatch on site.
We quote per project rather than publishing prices. What is stable is which variables move the number and, more usefully, which of them will keep costing you money after the machine is installed.
After the twelve month warranty ends, knives, screens and bearings are supplied at cost price, because a stalled machine costs you more than the part does.
Two quotations for the same machine name can differ by a large margin. In this category the difference almost always comes from these three lines.
Full budgeting logic across a whole line, including which quotation lines are utilities and which are wear items.
Cost guideFour short answers are enough for an engineer to size this station properly. Without them any reply is a generic model list.
We will size the category from the process variable first, then recommend the model or station count that fits it.
What buyers ask our engineers most often about this station. If your question is not here, send the material description and we will answer it directly.
Ask an engineerFour things, and they call for different specifications. Recycling, where the output feeds a washing or reprocessing line and consistency matters. Volume reduction, to cut transport and storage cost, where only bulk density matters. Secure destruction of recalled or branded product, where the output must be unusable. And pre-treatment for disposal or energy recovery, where the receiving facility sets the particle size.
The same platform can, with different wear parts and different expectations. A twin-shaft rotor at 8 to 15 rpm shears all three. What changes is knife steel, screen aperture and how often you sharpen: nails in pallets and grit in paper bales wear edges far faster than clean plastic does. Tell us the mix and we will specify for the most demanding component, not the average.
Rotor speed. Our shredders run 8 to 74 rpm depending on series, which is what lets them shear whole items, and they deliver 20 to 100 mm. A granulator runs far faster against a screen and delivers 8 to 16 mm, but cannot take oversized material. Many installations use both, shredder first.
Typically 20 to 100 mm, set by the screen aperture rather than the rotor. If you need finer than that, put a crusher behind the shredder. Fitting a very fine screen to a shredder cuts throughput sharply and raises power consumption per ton, and it still will not match what a granulator delivers.
Occasional metal is survivable with tungsten carbide knives and the automatic overload reversal that all our series have through Siemens PLC control. Nails in pallets are routine; a steel bar is not. Deliberate metal content changes the knife specification and the wear budget, so it needs discussing before the order rather than after the first breakage.
No. We build the shredding machine and we build complete lines for plastics only. For wood, paper, textiles or metal we are happy to be the shredding stage in a line completed by other suppliers, and we will specify the interface properly so it fits. We would rather tell you that now than partway through a project.
By witness and by record. We can film the run and photograph the output, which is what most recall and expired-stock jobs need. If your requirement is a certified destruction process under audit, that is a service arrangement on your side rather than a machine specification, and the shredder is one part of it.
This page covers one station. These three answer what comes before it, what a quotation should contain, and what the machines look like in service.